Projects undertaken 

       

·        Providing Engineering Support on a continuous basis to Alfa Laval Inc., Canada in reviewing and verifying the design Packages for various Heat Exchangers, Process Equipments on various projects including review of the calculations for Code compliance and obtaining Design registration (CRN) from Regulatory Authorities such as ABSA, TSSA, BCSA, ACI on behalf of Alfa Laval.

          

 ·      Consultancy from "Concept to Commissioning" for 3.0 MW Cogen Plant for Chadha Papers Ltd. This includes the study of the client's requirements mainly for Power and Process steam, making the alternate proposals, Heat and Mass balance, Preparation of specifications for various equipment including Boiler, Steam Turbine, Water Treatment Plant, Cooling Tower, Fuel handling system, Pumps, Valves, Piping, etc. Evaluation of the offers, recommendation to the client. Plant Layout, Detailed Engineering including interfacing, Piping Engineering, etc.     

       

·        Design and detailed Engineering for main steam piping at 65 kg/cm2 510°C. This included layout, stress analysis, preparation of IBR Package to get the approval of design from Indian Boiler Regulation (equivalent to TSSA in Canada), interfacing with the piping of existing four boilers and turbines. Main client was Indian Metal & Ferro Alloys Ltd., Choudhwar. Job awarded by M/s ISGEC John Thompson.

 

·        Design and detailed Engineering of the Complete Power cycle piping including interfacing for Sunflag Iron & Steels Co. Ltd. for their 15 MW Cogen Plant. Job included developing layout, detailed engineering, stress analysis, IBR Package, supporting, preparation of fabrication drawings, etc. Job awarded by M/s DLF Industries Ltd. 

·        Complete Piping Consultancy job including basic layout, pipe sizing, materials, stress analysis, preparation of IBR package including coordination and obtaining approval from the technical authority (IBR), detailed Engineering for MODIPON FIBRES, Unit of Modipon Ltd.) for their Gas Turbine Project.

       

·        Detailing including preparation of Isometric drawings, fabrication drawings of Power cycle Piping for EID Perry (I) Ltd. for their 24.5 MW Captive power Plant. Job awarded by DLF Industries Ltd.

       

·        Design and detailed Engineering of the Power Cycle Piping for DLF Cement Ltd. for their 15 MW Captive power plant. Job awarded by DLF Industries Ltd.   

 

·        Study and recommendations for improvements to the existing 32 TPH Boiler and the steam turbine for Amrit Papers Ltd. for efficient running of the plant. 

·        Development of the piping and equipment layout drawings for various systems for Waeschle Ideal Pvt., Ltd. for one of the Korean Projects. 

·        Power Cycle Piping for Anand Duplex Ltd. which including layouts development, piping engineering, stress analysis and preparation of IBR package for their Cogen Plant. 

·        Design and detailed Engineering of various lines including Turbine exhaust,  Condensate for testing bed of DLF Industries Ltd. 

·        Design and detailed Engineering for the Turbine skid for a typical Turbo Generator Set of 15 MW Turbine for DLF Industries Ltd. 

                            

·        Consultancy for 3.0 MW Cogen Plant for Cheema Paper Ltd. This included a study of the client's requirements, heat and mass balance, checking of the specifications of the major equipment including boiler, steam turbine. Design and detailed engineering of piping systems including Steam piping, IBR documentation, etc.

              

·        Detailed Engineering including preparation of IBR documentation for 1.5 MW Cogen plant including Power Cycle Piping and Process steam piping for U.P.Lime Chem Ltd.  

·        Design and detailed Engineering of process and steam piping for Rampur Distillery, Rampur. The scope included the design support during erection and commissioning.

·         A study of the complete 2.5 MW Cogen Plant for Yash Papers Ltd. including turbine, boiler and all related auxiliaries and submit a report for required modifications for efficient running of the plant.

       

·        Study and recommendation for improvements of the existing 2 Nos. 32TPH Boiler and 2.5 MW Turbine, complete steam piping, etc. for Oswal Sugar Ltd.(taken over by Chadha Sugar) for efficient running of the Plant.

            

                 