Mecsengineering

CRN Certification Checklist: Documents You Need Before Submitting

When offering industrial equipment design or professional engineering services in Canada, obtaining a valid Canadian Registration Number (CRN) is an essential regulatory step.

For firms like MECS Engineering, which specialize in pressure equipment design review and compliance, submitting accurate and complete documentation is key to avoiding review delays or registration rejections. Our team helps clients navigate the CRN process efficiently from start to finish.

Meaning of Canadian Registration Number

A CRN is a unique identifier issued by a provincial or territorial safety authority that confirms that the design of pressure equipment (such as boilers, pressure vessels, and fittings) is compliant with Canadian safety codes. Without a valid CRN, equipment cannot legally be used or commissioned in most Canadian jurisdictions.

For firms offering industrial engineering services, obtaining CRN registration is a technical and regulatory requirement—aligning your design documentation, calculations, and drawings with code requirements is non-negotiable.

Key Documents You Must Gather Before Submission

To streamline your CRN certification, prepare the following essential items:

  1. Complete Design Drawings & Calculations: Signed and stamped by a licensed professional engineer. These must reflect the applicable codes (e.g., ASME, CSA) for the equipment. 
  2. Scope of Registration / Product Catalogue: For fittings or repeat items, provide a list of products, sizes, and variables to be registered. 
  3. Quality Program Certificate: A valid certificate showing the manufacturer’s quality management system, when required. It is a mandatory requirement for fittings.
  4. Statutory Declaration Form(s): Required for fitting categories; must be properly signed, dated, and notarized.
  5. Submission Form & Fee Payment: Complete required applications forms with correct information. If applying for Piping registration, make sure to provide PP number, if available.

By organising these documents in advance, you’ll reduce back‐and‐forth and speed up approval.

Important for Professional & Industrial Engineering Services

As a provider of professional engineering services and industrial engineering services, MECS Engineering understands that failing to comply with CRN regulation can result in regulatory non-compliance, liability exposure or project delays. Ensuring your documentation is complete also reflects well on your engineering practice—demonstrating professionalism, technical competence and regulatory awareness.

Final Tips Before You Submit
  • Ensure your drawings and calculations reflect the correct design code and jurisdiction(s).
  • Double-check that each required form is signed and dated appropriately.
  • Use the official CRN Portal where applicable for electronic submission.
  • Retain records of submission, receipt acknowledgement and follow up until registration is granted.
  • If registering in multiple jurisdictions, note that fees and review criteria may vary.
CONCLUSION

Securing a CRN is not simply a bureaucratic step—it’s a benchmark that speaks to the quality of your design work and your commitment to safe operations. With MECS Engineering’s support, you can confidently navigate the CRN certification process and focus on delivering Professional industrial engineering services.

Contact MECS Engineering to check whether your submission of documents is correctly submitted. And, if you are having any difficulty, we’re here for your support.